Our Story

2017

Interlift is integrated into FLG Services.

2017

2016

Interlift is integrated into FLG ServicesInterlift is integrated into FLG Services.

2016

2016

FLG Services expands its network further to 18 locations. These are in Bridgwater, Burton upon Trent, and Whitehaven.

2016

2015 – 2016

FLG Services develops a heavy duty monorail system to enable installation of the curtain wall on the American Embassy situated on the Southbank in London.

2015 – 2016

2015

Further locations open in Edinburgh, Wilton and Grimsby.

2015

2014

FLG Services grows to 11 Service Centre locations under A-Plant. These new locations are in Oldbury, Sunderland, Newark, Manchester, Sheffield, Glasgow and Liverpool.

2014

2014

Fairview Lifting Gear Services and Engineering is rebranded to FLG Services.

2014

2013

Fairview Lifting Gear Services and Engineering is acquired by A-Plant, part of FTSE100 company Ashtead Group plc.

2013

2013

Fairview Lifting Gear Services developed a five-storey travelling access platform that was installed to the 'Halo' of the HSBC building in Canary Wharf to allow new signage and façade to be replaced.

2013

2011

Fairview Lifting Gear Services awarded the Cerberus contract on the Leadenhall building by Laing O'Rourke. This included monorail systems and access solutions and was featured in a Channel 5 documentary. 

2011

2008

Fairview Lifting Gear Services increases members of staff to 50.

2008

2005

Fairview Lifting Gear Services operates out of four locations in the South East of England: Rainham, Epsom, Hayes and Ipswich.

2005

2004

Fairview Lifting Gear Engineering is formed focusing on bespoke solutions.

2004

2002

Fairview Lifting Gear Services was formed and opened its first Service Centre in Rainham.

2002